Saturday 7th September 2013 - Rising above it all 2013

View previous topic View next topic Go down

Saturday 7th September 2013 - Rising above it all 2013

Post by Admin on Sun Sep 15, 2013 6:12 am

2013 2013 2013 <div dir="ltr" style="text-align: left;" trbidi="on"><span style="font-family: Arial, Helvetica, sans-serif;">A difficult day today, &nbsp;as internal politics surfaced in recent days &nbsp;and &nbsp;have wounded those who have worked so hard at getting us where we are today.</span><br /><span style="font-family: Arial, Helvetica, sans-serif;"><br /></span><span style="font-family: Arial, Helvetica, sans-serif;">Nevertheless our Saturday volunteers roses above it and I can report the following:</span><br /><span style="font-family: Arial, Helvetica, sans-serif;"><br /></span><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">After a cool and blustery start 12 stalwarts braved the conditions and during the afternoon got into top gear.</span></div><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">A big fire was started at the northern end beyond the Drott and a considerable amount of rubbish and weeds were burned and the whole site now looks a lot cleaner.<o:p></o:p></span></div><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">Meanwhile the Brickies Roger and Tony supported by Clive and Roger got stuck in to the laying of the final heavy concrete blocks in the foundation of 2B and at the end of play had got the job finished, it is now ready for the concrete crew on Wednesday&nbsp;.<o:p></o:p></span></div><br /><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">Dave and John B continued with the never ending job of weeding&nbsp;, whilst JC started the big job of getting the detailed setting out for the signal box under way.&nbsp; The piling contractor is due for a site planning and discussion meeting&nbsp;next Wednesday.<o:p></o:p></span></div><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;"><br /></span></div><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">I'm afraid it wasn't a day for taking photos - lets hope we can resume normal working as soon as possible. Bill</span></div><br /></div><br> 2013 2013 2013 <br><div dir="ltr" style="text-align: left;" trbidi="on"><span style="font-family: Arial, Helvetica, sans-serif;">A difficult day today, &nbsp;as internal politics surfaced in recent days &nbsp;and &nbsp;have wounded those who have worked so hard at getting us where we are today.</span><br /><span style="font-family: Arial, Helvetica, sans-serif;"><br /></span><span style="font-family: Arial, Helvetica, sans-serif;">Nevertheless our Saturday volunteers roses above it and I can report the following:</span><br /><span style="font-family: Arial, Helvetica, sans-serif;"><br /></span><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">After a cool and blustery start 12 stalwarts braved the conditions and during the afternoon got into top gear.</span></div><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">A big fire was started at the northern end beyond the Drott and a considerable amount of rubbish and weeds were burned and the whole site now looks a lot cleaner.<o:p></o:p></span></div><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">Meanwhile the Brickies Roger and Tony supported by Clive and Roger got stuck in to the laying of the final heavy concrete blocks in the foundation of 2B and at the end of play had got the job finished, it is now ready for the concrete crew on Wednesday&nbsp;.<o:p></o:p></span></div><br /><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">Dave and John B continued with the never ending job of weeding&nbsp;, whilst JC started the big job of getting the detailed setting out for the signal box under way.&nbsp; The piling contractor is due for a site planning and discussion meeting&nbsp;next Wednesday.<o:p></o:p></span></div><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;"><br /></span></div><div class="MsoNormal"><span style="font-family: Arial, Helvetica, sans-serif;">I'm afraid it wasn't a day for taking photos - lets hope we can resume normal working as soon as possible. Bill</span></div><br /></div><br>2013 2013 2013 <br> <a href="http://www.matrixar.com/" title="Matrix ">المصفوفة : أجمل الخلفيات والصور</a>

Admin
Admin

Posts : 64122
Join date : 2013-02-22

View user profile http://prowebsites1.forumaroc.net

Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum